April 2021 Progress 116 images Created 14 Feb 2022

Documentary photography of the South Ferriby Flood Alleviation Scheme build running from March 2019 until completion in October 2021. All images are ©Darren Casey - Licensing available on request. Strictly no syndication.
Next
View: 100 | All

Loading ()...

  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. Shown by the gate is George Fletcher from the Environment Agency. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-108-2.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-35.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-34.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-96.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-88.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-94.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-30.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-95.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-87.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-89.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-25.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-85.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-86.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-83.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-84.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-31.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-32.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-28.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-82.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-36.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-93.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-29.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-33.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-90.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-37.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-91.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-27.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-26.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-61.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-92.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-20.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-21.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. Shown by the gate is George Fletcher from the Environment Agency. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-108.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-51.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-18.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. Shown by the gate is George Fletcher from the Environment Agency. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-109.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-43.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-19.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-58.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-66.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-105.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-17.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-70.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-46.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-49.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-54.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-63.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-45.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-60.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-62.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-69.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-59.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-80.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-81.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-57.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-106.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-64.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-67.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-71.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-104.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-73.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-98.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-79.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-48.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-50.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-40.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-47.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-22.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-39.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-44.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-97.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-38.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-68.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-115.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-15.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-53.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-103.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. Shown left to right from the Environment Agency is Richard Swallow, Martin Bellham, Emma Haines and George Fletcher . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-110.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-107.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-55.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-42.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-113.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-52.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-41.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-56.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-14.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-10.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-99.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-6.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-23.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-24.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-8.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-11.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-75.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-111.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-16.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-65.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-9.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-78.jpg
  • Pictured for Cemex are Progress images of the flood alleviation scheme at South Ferriby.  Phase 2 continues with the installation of the flood barrier gate. . Images Copyright ©DCimaging Darren Casey
    DMC_230421_cemexfas2_progress-12.jpg
Next